SiteBid AI — Septic & Field Bed Estimate
Conventional gravel or chamber system, tank & d-box, bedding, hauling, and permit fees.
System Type
Field Geometry
Tank & Piping
Productivity & Haul
Rates & Fees
Markup
Client Info
Results
System
Gravel
Trench width (ft)
3.00
Field excavation (yd³)
55.56
Tank excavation (yd³)
13.33
Total excavation (yd³)
68.89
Bedding (yd³)
11.11
Gravel cover (yd³)
11.11
Gravel total (yd³)
22.22
Backfill (yd³)
46.67
Haul-off (yd³)
41.33
Trips
4
Trucking hours
1.67 h
Dig hours
2.46 h
Backfill hours
1.17 h
Loader hours
0.49 h
Tank
$1,800.00
D-Box
$150.00
Risers
$0.00
Chambers
$0.00
Gravel
$1,000.00
Perforated pipe
$500.00
Solid pipe
$180.00
Fabric
$270.00
Dump fees
$330.67
Equipment
$507.69
Trucking
$158.33
Extras
$0.00
Subtotal
$4,896.69
Base (OH+Cont)
$5,876.03
Total (with profit)
$6,912.98
Permit fees (pass-through)
$0.00
Grand Total
$6,912.98
Sensitivity (share of subtotal)
- Materials: 86%
- Trucking: 3%
- Equipment: 10%
Proposal Preview

Your Company Name LLC
(555) 555-5555 • bids@yourcompany.com • https://yourcompany.com
123 Main St, Yourtown, MI 49000
MI Contractor #12345
Proposal
9/5/2025
Valid 14 days
Bill To
—
Project
Septic System (Gravel Trench)
Install complete septic system per plan/spec; excavation, bedding/chambers or gravel, tank & d-box set, piping, backfill, and restoration as noted.
Scope of Work
- Gravel trench system: bedding 0.5 ft under pipe, 0.5 ft cover, fabric on top.
- Field: 200 ft total length × 3 ft wide × 2.5 ft depth.
- Tank excavation ~10 × 6 × 6 ft. D-box: 1, risers: 0.
- Piping: perforated 200 ft, solid 60 ft @ Ø 4"
- Haul-off ~60% of spoils; truck 12 yd³; RT haul 25 min.
| Item | Amount |
|---|---|
| Materials | $4,230.67 |
| Equipment & Labor | $507.69 |
| Trucking | $158.33 |
| Subtotal | $4,896.69 |
| Overhead (10%) + Contingency (10%) | $979.34 |
| Profit (15%) | $1,036.95 |
| Total (before permit) | $6,912.98 |
| Grand Total | $6,912.98 |
Inclusions
- Excavation, bedding/chambers or gravel per spec
- Tank & d-box set and connection
- Piping, backfill, shaping
- Trucking/disposal as calculated
- Mobilization
Exclusions
- Rock excavation or groundwater control/dewatering
- Shoring/boxes, perc tests/design/permits
- Electrical for pumps/alarms if required
- Traffic control beyond noted
- Items not specifically described
Payment terms: Net 15 unless otherwise stated. Scheduling subject to weather and site access.
Acceptance
Client Signature: _______________________________
Printed Name: __________________________________
Date: __________________________________________
Company
Signer: _______________________________
Title: __________________________________
Date: __________________________________
Assumptions (auto-print on quote)
- Gravel bedding 0.5 ft under pipe, 0.5 ft cover, fabric on top.
- Field length 200 ft × width 3 ft × depth 2.5 ft.
- Tank excavation 10 × 6 × 6 ft.
- Haul-off 60% of spoils; truck 12 yd³; RT 25 min.
- Overhead 10%, Contingency 10%, Profit 15%. Permit fees listed separately (no markup).
Inclusions / Exclusions (draft)
Inclusions: excavation, bedding/gravel (as applicable), tank & d-box set, piping, backfill/shape, trucking/disposal, chambers or gravel per spec, mobilization.
Exclusions: rock excavation, groundwater control/dewatering, shoring/boxes, perc tests/design, electrical for pumps/alarms, traffic control beyond noted, permits/fees (listed separately).