SiteBid AI — Septic & Field Bed Estimate

Conventional gravel or chamber system, tank & d-box, bedding, hauling, and permit fees.

System Type

Field Geometry

Tank & Piping

Productivity & Haul

Rates & Fees

Markup

Client Info

Results

System
Gravel
Trench width (ft)
3.00
Field excavation (yd³)
55.56
Tank excavation (yd³)
13.33
Total excavation (yd³)
68.89
Bedding (yd³)
11.11
Gravel cover (yd³)
11.11
Gravel total (yd³)
22.22
Backfill (yd³)
46.67
Haul-off (yd³)
41.33
Trips
4
Trucking hours
1.67 h
Dig hours
2.46 h
Backfill hours
1.17 h
Loader hours
0.49 h
Tank
$1,800.00
D-Box
$150.00
Risers
$0.00
Chambers
$0.00
Gravel
$1,000.00
Perforated pipe
$500.00
Solid pipe
$180.00
Fabric
$270.00
Dump fees
$330.67
Equipment
$507.69
Trucking
$158.33
Extras
$0.00
Subtotal
$4,896.69
Base (OH+Cont)
$5,876.03
Total (with profit)
$6,912.98
Permit fees (pass-through)
$0.00
Grand Total
$6,912.98

Sensitivity (share of subtotal)

  • Materials: 86%
  • Trucking: 3%
  • Equipment: 10%

Proposal Preview

Your Company Name LLC logo
Your Company Name LLC
(555) 555-5555bids@yourcompany.com • https://yourcompany.com
123 Main St, Yourtown, MI 49000
MI Contractor #12345
Proposal
9/5/2025
Valid 14 days
Bill To
Project
Septic System (Gravel Trench)
Install complete septic system per plan/spec; excavation, bedding/chambers or gravel, tank & d-box set, piping, backfill, and restoration as noted.
Scope of Work
  • Gravel trench system: bedding 0.5 ft under pipe, 0.5 ft cover, fabric on top.
  • Field: 200 ft total length × 3 ft wide × 2.5 ft depth.
  • Tank excavation ~10 × 6 × 6 ft. D-box: 1, risers: 0.
  • Piping: perforated 200 ft, solid 60 ft @ Ø 4"
  • Haul-off ~60% of spoils; truck 12 yd³; RT haul 25 min.
ItemAmount
Materials$4,230.67
Equipment & Labor$507.69
Trucking$158.33
Subtotal$4,896.69
Overhead (10%) + Contingency (10%)$979.34
Profit (15%)$1,036.95
Total (before permit)$6,912.98
Grand Total$6,912.98
Inclusions
  • Excavation, bedding/chambers or gravel per spec
  • Tank & d-box set and connection
  • Piping, backfill, shaping
  • Trucking/disposal as calculated
  • Mobilization
Exclusions
  • Rock excavation or groundwater control/dewatering
  • Shoring/boxes, perc tests/design/permits
  • Electrical for pumps/alarms if required
  • Traffic control beyond noted
  • Items not specifically described

Payment terms: Net 15 unless otherwise stated. Scheduling subject to weather and site access.

Acceptance
Client Signature: _______________________________
Printed Name: __________________________________
Date: __________________________________________
Company
Signer: _______________________________
Title: __________________________________
Date: __________________________________

Assumptions (auto-print on quote)

  • Gravel bedding 0.5 ft under pipe, 0.5 ft cover, fabric on top.
  • Field length 200 ft × width 3 ft × depth 2.5 ft.
  • Tank excavation 10 × 6 × 6 ft.
  • Haul-off 60% of spoils; truck 12 yd³; RT 25 min.
  • Overhead 10%, Contingency 10%, Profit 15%. Permit fees listed separately (no markup).

Inclusions / Exclusions (draft)

Inclusions: excavation, bedding/gravel (as applicable), tank & d-box set, piping, backfill/shape, trucking/disposal, chambers or gravel per spec, mobilization.

Exclusions: rock excavation, groundwater control/dewatering, shoring/boxes, perc tests/design, electrical for pumps/alarms, traffic control beyond noted, permits/fees (listed separately).