SiteBid AI — Pond Estimate

Bowl cut (frustum), on-site shaping, optional beach, stone ring, overflow pipe, clay import, and permit fees.

Geometry & Slopes

Productivity & Haul

Rates

Overflow Pipe & Appurtenances

Beach (Sand)

Decorative Stone Ring

Clay Import (rare)

Extras & Permit

Markup

Client Info

Results

Bottom length (ft)
60.0
Bottom width (ft)
20.0
Excavation (yd³)
1752.4
Haul-off (yd³)
438.1
Trips
37
Trucking hours
18.50 h
Excavator hours
43.81 h
Dozer hours
21.90 h
Loader hours
0.00 h
Beach sand (yd³)
0.0
Decorative stone (yd³)
0.0
Decorative stone (t)
0.0 t
Materials cost
$0.00
Trucking cost
$1,757.50
Equipment cost
$8,980.84
Extras
$0.00
Subtotal
$10,738.34
Base (OH+Cont)
$12,886.01
Total (with profit)
$15,160.01
Permit fees (pass-through)
$0.00
Grand Total
$15,160.01

Sensitivity (share of subtotal)

  • Materials: 0%
  • Trucking: 16%
  • Equipment: 84%

Proposal Preview

Your Company Name LLC logo
Your Company Name LLC
(555) 555-5555bids@yourcompany.com • https://yourcompany.com
123 Main St, Yourtown, MI 49000
MI Contractor #12345
Proposal
9/5/2025
Valid 14 days
Bill To
Project
Pond Construction
Excavate frustum bowl to design depth and slopes; shape; haul/dispose per calc; optional features as listed.
Scope of Work
  • Excavate basin to depth 10 ft, side slopes 3:1 (approx. bottom 60×20 ft).
  • Haul off ~25% spoils; on-site shaping/grading.
ItemAmount
Equipment & Labor$8,980.84
Trucking$1,757.50
Subtotal$10,738.34
Overhead (10%) + Contingency (10%)$2,147.67
Profit (15%)$2,274.00
Total (before permit)$15,160.01
Grand Total$15,160.01
Inclusions
  • Excavation and on-site shaping
  • Hauling & disposal as noted
  • Mobilization
Exclusions
  • Rock excavation or dewatering
  • Erosion control, landscaping, fencing, water fill
  • Permits/fees (listed separately)
  • Items not specifically described

Payment terms: Net 15 unless otherwise stated. Scheduling subject to weather and site access.

Acceptance
Client Signature: _______________________________
Printed Name: __________________________________
Date: __________________________________________
Company
Signer: _______________________________
Title: __________________________________
Date: __________________________________

Assumptions (auto-print on quote)

  • Frustum bowl from top 120×80 ft to bottom ~60×20 ft @ depth 10 ft, slopes 3:1.
  • Haul-off fraction 25%, truck 12 yd³, round-trip 30 min.
  • Optional pipe 0 ft @ Ø 4" with 0 end sections.
  • Beach 0×0 ft × 0 ft; decorative stone 0×0 ft × 0 ft.
  • Overhead 10%, Contingency 10%, Profit 15%. Permits listed separately.

Inclusions / Exclusions (draft)

Inclusions: excavation, on-site shaping, hauling as noted, optional pipe, beach/stone if listed, mobilization.

Exclusions: rock excavation, dewatering, utility relocations, erosion control, landscaping, fencing, water fill, permits/fees (listed separately), items not specifically described.