SiteBid AI — Driveway Estimate
Dozer-first flow, two stone lifts, and extras included.
Dimensions & Lifts
Base lift (ft)
Top lift (ft)
Base density (t/yd³)
Top density (t/yd³)
Permit Fees (pass-through)
Stripping Method
Haul & Compaction
Rates & Extras
Base stone ($/ton)
Top stone ($/ton)
Client Info
Results
Heads up:
- No roller passes selected—ensure tracks/truck tires will achieve compaction you want.
Area
2,400 ft²
Strip volume
22.22 yd³
Base vol
29.60 yd³
Top vol
14.84 yd³
Stone total
44.44 yd³
Base tons
39.96 t
Top tons
22.27 t
Trips
5
Dozer hours
0.30 h
Excavator hours
0.00 h
Loader hours
0.99 h
Trucking hours
2.50 h
Roller hours
0.00 h
Stone cost
$1,329.03
Trucking cost
$237.50
Equipment cost
$150.64
Extras
$0.00
Subtotal
$1,717.17
Base (OH+Cont)
$2,060.60
Total (with profit)
$2,424.24
Permit fees (pass-through)
$0.00
Grand Total
$2,424.24
Sensitivity (share of subtotal)
- Stone: 77%
- Trucking: 14%
- Equipment+Labor: 9%
Proposal Preview

Your Company Name LLC
(555) 555-5555 • bids@yourcompany.com • https://yourcompany.com
123 Main St, Yourtown, MI 49000
MI Contractor #12345
Proposal
9/5/2025
Valid 14 days
Bill To
—
Project
Driveway Construction
Topsoil strip, stone base/top, haul and shaping as calculated.
Scope of Work
- Strip topsoil ~3" using dozer.
- Place 4" base stone and 2" top stone.
- Shape/grade, haul/dispose spoils.
| Item | Amount |
|---|---|
| Materials | $1,329.03 |
| Equipment & Labor | $150.64 |
| Trucking | $237.50 |
| Subtotal | $1,717.17 |
| Overhead (10%) + Contingency (10%) | $343.43 |
| Profit (15%) | $363.64 |
| Total (before permit) | $2,424.24 |
| Grand Total | $2,424.24 |
Inclusions
- Strip & grade, aggregate supply/placement
- Trucking & disposal
- Mobilization
Exclusions
- Rock excavation or dewatering
- Unsuitable subgrade remediation
- Permits/fees unless listed
- Geotextile fabric unless listed
Payment terms: Net 15 unless otherwise stated. Scheduling subject to weather and site access.
Acceptance
Client Signature: _______________________________
Printed Name: __________________________________
Date: __________________________________________
Company
Signer: _______________________________
Title: __________________________________
Date: __________________________________