SiteBid AI — Driveway Estimate

Dozer-first flow, two stone lifts, and extras included.

Dimensions & Lifts

Base lift (ft)
Top lift (ft)
Base density (t/yd³)
Top density (t/yd³)

Permit Fees (pass-through)

Stripping Method

Haul & Compaction

Rates & Extras

Base stone ($/ton)
Top stone ($/ton)

Client Info

Results

Heads up:
  • No roller passes selected—ensure tracks/truck tires will achieve compaction you want.
Area
2,400 ft²
Strip volume
22.22 yd³
Base vol
29.60 yd³
Top vol
14.84 yd³
Stone total
44.44 yd³
Base tons
39.96 t
Top tons
22.27 t
Trips
5
Dozer hours
0.30 h
Excavator hours
0.00 h
Loader hours
0.99 h
Trucking hours
2.50 h
Roller hours
0.00 h
Stone cost
$1,329.03
Trucking cost
$237.50
Equipment cost
$150.64
Extras
$0.00
Subtotal
$1,717.17
Base (OH+Cont)
$2,060.60
Total (with profit)
$2,424.24
Permit fees (pass-through)
$0.00
Grand Total
$2,424.24

Sensitivity (share of subtotal)

  • Stone: 77%
  • Trucking: 14%
  • Equipment+Labor: 9%

Proposal Preview

Your Company Name LLC logo
Your Company Name LLC
(555) 555-5555bids@yourcompany.com • https://yourcompany.com
123 Main St, Yourtown, MI 49000
MI Contractor #12345
Proposal
9/5/2025
Valid 14 days
Bill To
Project
Driveway Construction
Topsoil strip, stone base/top, haul and shaping as calculated.
Scope of Work
  • Strip topsoil ~3" using dozer.
  • Place 4" base stone and 2" top stone.
  • Shape/grade, haul/dispose spoils.
ItemAmount
Materials$1,329.03
Equipment & Labor$150.64
Trucking$237.50
Subtotal$1,717.17
Overhead (10%) + Contingency (10%)$343.43
Profit (15%)$363.64
Total (before permit)$2,424.24
Grand Total$2,424.24
Inclusions
  • Strip & grade, aggregate supply/placement
  • Trucking & disposal
  • Mobilization
Exclusions
  • Rock excavation or dewatering
  • Unsuitable subgrade remediation
  • Permits/fees unless listed
  • Geotextile fabric unless listed

Payment terms: Net 15 unless otherwise stated. Scheduling subject to weather and site access.

Acceptance
Client Signature: _______________________________
Printed Name: __________________________________
Date: __________________________________________
Company
Signer: _______________________________
Title: __________________________________
Date: __________________________________