SiteBid AI — Basement Estimate

Overdig box + ramp, under-slab stone, optional perimeter drain, trucking, dump fees, extras, and permit fees.

Geometry & Overdig

Ramp (access)

Productivity & Haul

Rates & Materials

Under-slab & Perimeter Drain

Extras & Permit

Markup

Client Info

Results

Excavation pad (ft)
64.0 × 40.0
Pad area (ft²)
2,560
Box volume (yd³)
758.5
Ramp volume (yd³)
35.6
Topsoil strip (yd³)
25.9
Excavation total (yd³)
794.1
Haul-off (yd³)
317.6
Trips
27
Trucking hours
13.50 h
Excavator hours
17.65 h
Dozer hours
7.94 h
Loader hours
0.59 h
Under-slab stone (yd³)
26.4
Drain gravel (yd³)
0.0
Drain length (ft)
0 ft
Materials cost
$3,465.04
Trucking cost
$1,282.50
Equipment cost
$3,487.87
Dump fees
$2,541.04
Extras
$0.00
Subtotal
$8,235.41
Base (OH+Cont)
$9,882.49
Total (with profit)
$11,626.46
Permit fees (pass-through)
$0.00
Grand Total
$11,626.46

Sensitivity (share of subtotal)

  • Materials: 42%
  • Trucking: 16%
  • Equipment: 42%

Assumptions (auto-print on quote)

  • Excavation to bottom of footing depth 8 ft with overdig 2 ft each side; ramp 20×12 ft wedge.
  • Haul-off 40% of spoils; truck 12 yd³; RT haul 30 min.
  • Under-slab stone 0.33 ft; perimeter drain length 0 ft.
  • Overhead 10%, Contingency 10%, Profit 15%. Permits listed separately.

Inclusions / Exclusions (draft)

Inclusions: excavation with overdig and ramp, on-site shaping, hauling as noted, under-slab stone and/or perimeter drain if listed, mobilization.

Exclusions: rock excavation, dewatering, shoring/bracing, utility relocations, concrete, waterproofing, sump systems, erosion control, permits/fees (listed separately).

Proposal Preview

Your Company Name LLC logo
Your Company Name LLC
(555) 555-5555bids@yourcompany.com • https://yourcompany.com
123 Main St, Yourtown, MI 49000
MI Contractor #12345
Proposal
9/5/2025
Valid 14 days
Bill To
Project
Basement Excavation
Quantities, haul, and productivities as calculated above.
Scope of Work
  • Excavate to footing depth 8 ft with 2 ft overdig each side.
  • Ramp 20×12 ft for access; haul-off ≈ 40% of spoils.
  • Under-slab stone 0.33 ft; perimeter drain 0 ft (if listed).
ItemAmount
Materials$3,465.04
Equipment & Labor$3,487.87
Trucking$1,282.50
Subtotal$8,235.41
Overhead (10%) + Contingency (10%)$1,647.08
Profit (15%)$1,743.97
Dump Fees$2,541.04
Total (before permit)$11,626.46
Grand Total$11,626.46
Inclusions
  • Mobilization and access ramp
  • Excavation, shaping, and export per plan
  • Trucking & disposal as noted
Exclusions
  • Rock excavation or dewatering
  • Shoring/bracing or utility relocations
  • Concrete, waterproofing, sump systems
  • Permits/fees unless listed

Payment terms: Net 15 unless otherwise stated. Scheduling subject to weather and site access.

Acceptance
Client Signature: _______________________________
Printed Name: __________________________________
Date: __________________________________________
Company
Signer: _______________________________
Title: __________________________________
Date: __________________________________